Afreza L. Hernanda
Projects / jabodetabek-connect · 1 plate06°12'S 106°49'E

Project hub

Jabodetabek Connect

An interactive octilinear diagram of Jabodetabek's operating rail and BRT network (128 stations, 13 lines, animated trains), redrawn from the official static PDF map.

Project chronology

  1. Jul 16, 2026

    Jabodetabek-Connect: redrawing Jakarta's transit map, Mini Metro-style

    An interactive octilinear diagram of Jabodetabek's operating rail and BRT network (128 stations, 13 lines, animated trains), redrawn from the official static PDF map.

The next post from this project joins automatically via its project: field.